A "First In, First Out" scenario would not apply to hardware. There was a bucket or a bin of what was required at each assembly station. Depending on what or where, additional inventory would be either poured on top of the existing, or the containers swapped. It's not rocket science. A more common problem would be shortages, and the scramble to find a suitable replacement to be approved by the resident assembly line engineer.
Jim