Jeff
I was talking to a person who's business revolves around rebuilding certain classic mustang drivetrain components and he advised that my 289 with a cast dat of 4/25 and assembly date of 4/27 was too close to my build date of 5/8/67 build date on my 1967 mustang. Thought it would be too short of period based on ship times to the San Jose plant.
Your thoughts?
Mike
Yes that is pretty tight and would be the tightest (days between assembly of the engine and its installation in a 67 San Jose but have to report that I do have at least one other example where that spread was one more day than yours so I would think that it was possible.
In the cited examples the assembly date for that 289 was 7E26 with an real build date of 08F. Given that both of these examples were built late in the production year and during months where the weather, that might affect sipping in other months of the year, should not be a factor I think it leads credence to the possibility or facts in this matter
Was lucky enough to have an example of a car completed exactly one month later at San Jose
Would be interested in your VIN so I can add your car to the spread sheet - you can use a PM to do so if you would rather not post it