Author Topic: 66 am 8 track and bezel installation diagram?  (Read 650 times)

Offline 7Lscjracer

  • Hero Member
  • *****
  • Posts: 521
66 am 8 track and bezel installation diagram?
« on: June 28, 2015, 02:32:58 PM »
Anybody have a legible picture of this?
Specifically I need to know what combination of nuts and internal tooth washers are required in what order to install the unit and bezel thanks.
69 Mach 1 San Jose Nov. 68 build
Bought May '81, sold Sept '20

Offline jwc66k

  • Hero Member
  • *****
  • Posts: 7346
Re: 66 am 8 track and bezel installation diagram?
« Reply #1 on: June 28, 2015, 04:10:41 PM »
You have the assembly information in the drawings. In the library section of this forum under "Mustang Hardware Spreadsheets, 64-66 -" you will find a spreadsheet sorted by application (MHW64-66AP01.xls) that has the descriptive technical information you need.
Jim
I promise to be politically correct in all my posts to keep the BBBB from vociferating.

Offline 7Lscjracer

  • Hero Member
  • *****
  • Posts: 521
Re: 66 am 8 track and bezel installation diagram?
« Reply #2 on: June 28, 2015, 05:18:06 PM »
Thanks I see 2 internal tooth washers and 2 nuts called out, so they'd simply have to install between the bezel and chrome knobs then.
Just to clarify, my question was only to do with what goes over the left and right shafts - how many and in what order.
I had envisioned more than one washer and nut per shaft is all, and I couldn't make out that fuzzy, small diagram pic.
69 Mach 1 San Jose Nov. 68 build
Bought May '81, sold Sept '20