I don't believe there's one correct way, but I've had pretty good luck installing the instrument cluster and clock panel first but leaving all the fasteners loose. Then I position the dash pad and start every fastener but again leave them all loose -- tightening them only after I'm satisfied everything is settling in well. The soft pad usually requires a fair amount of coaxing to fit. But I'm usually working solo and as Chris pointed out, without a helper it's hard to connect the map light and glove box wiring with the dash pad installed already. If that's not an issue, I don't see why his method wouldn't work as well.