Hi,
Is this reasoning correct?
The block cast date is end of September
The car manufacturing date is beginning of October
Thus, the timeframe between engine and car meeting eachother is limited to a few weeks around end of September, beginning of October.
So engine assembly most probably is in that short timeframe.
If this reasoning is correct, can we determine what water pump should be used?
The assumption herei s that the water pump was fitted to the engine, before the engine was fitted to the car
Maybe I'm getting this all wrong. I'm eager to learn.